Links for June 26th
- Water Treatment Plant 4 plans move forward - Other concerned residents in eight surrounding communities created the Spicewood Springs Road Tunnel Coalition to oppose the use of the Old Lampasas site for a 30- to 50-foot wide, 100-foot deep tunnel shaft.
- Stop The Shafts - The Austin Water Utility (AWU) has plans for a 3-year-long heavy construction project, called the "Jollyville Transmission Mains"
Leave a comment
You must be logged in to post a comment.